Red Line Phase 1 - IndyGo

Red Line Phase 1 - IndyGo

Location of Project: Indianapolis, IN

Services Provided: Design, Survey

Description of Project:  PCS Engineers was responsible for the maintenance of traffic and traffic signal design on the BRT Redline project.  Design elements included MOT schematics and full development of plans for vehicular traffic maintenance as well as pedestrians and cyclists for the Cultural Trail.  Several meetings with Indianapolis DPW were held to ensure that the MOT concurred with their expectations.

Allison Way and 10th Street Roundabout in Speedway, IN.

Allison Way and 10th Street Roundabout in Speedway, IN.

Location of Project: Speedway, IN

Services Provided: Construction Inspection

Description of Project: This project included the inspection of a single lane roundabout.  The total length of the approaches were approximately 1,600 feet.  The total construction cost was estimated at $1.1 million.

Hadley Road and CR700E Roundabout in Plainfield, IN.

Hadley Road and CR700E Roundabout in Plainfield, IN.

Location of Project: Plainfield, IN

Services Provided: Construction Inspection & Design

Description of Project: This project included the inspection and design of a new dual lane urban roundabout that replaced a four way stop condition.  The total length of the approaches was approximately 1,600 feet and included incorporating the Plainfield Trail system into the design.  Six new right of way parcel “takes” were also required.  The estimated construction cost was $1.5 million.

Crawfordsville Road/16th Street/Georgetown Road Intersection Reconstruction Roundabout; Contract No. R-35604.

Crawfordsville Road/16th Street/Georgetown Road Intersection Reconstruction Roundabout; Contract No. R-35604.

Location of Project: Speedway, IN

Services Provided: Construction Inspection

Description of Project: This project entails the reconstruction of the Crawfordsville Road/16th Street/Georgetown Road Intersection in Speedway, IN.  The work includes construction of realigned approach pavements, dual lane roundabout construction, decorative concrete pavers, storm sewers, curbs, sidewalks, ADA ramps, grading, paving, swales, private drives, public road approach, lighting, landscaping, striping, MOT, erosion control and signage.  The estimated construction cost for this project is approximately $5,200,000.

156th Street/Spring Mill Road Roundabout in Westfield, IN.

156th Street/Spring Mill Road Roundabout in Westfield, IN.

Location of Project: Westfield, IN

Services Provided: Construction Inspection

Description of Project: This project included the inspection and design of a new single lane urban roundabout.  The total length of the approaches was approximately 2,900 feet and included 20 new right of way parcel “takes”.  The estimated construction cost was $1.3 million.